Showcase Projects
Allied Signal, Inc.
Hopewell, VA
Plant
Chesterfield, VA
Services
Air Washer No. 2 Replacement Project
Value
$334,564
Scope
Furnish material, labor,
equipment, tools, supervision, and engineering to remove existing air
washer no. 2 on building six roof and install new casing, air washer
section, filter, chilled water piping, and new fan prop and motor. Also
included was air balance of the existing return air and supply fans.
This project was handled as a 'fast track' project consisting of 8 weeks construction time and was completed on schedule.
Plant
Churchill
Services
HVAC 535-V-820 Cooling Coil & Humidifier Replacement
Value
$11,992
Scope
Furnish materials, labor,
equipment, tools and supervision to remove existing chilled water coil
and install new coil. Included was the installation of a new humidifier,
piping, and insulation. This project was handled on a shutdown schedule
consisting of 6 days.
Plant
Chesterfield
Services
Misc. Metal Fabrication & Installation
Value
$15,061
Scope
Work consisted of furnishing
materials, shop labor, supervision, painting, sketching, and delivery of
miscellaneous items such as (1) surge bin SB-57; (2) ductwork
modifications, unit FN-84J and XT-294 motor cooling in building no. 12;
(3) pump guards for pump P-0278; (4) relocation of ductwork and one
blower inlet filter; (5) misc. stainless steel transition pieces for
VT-643; and (6) fabrication and delivery of 18" sight glasses.