Alltech Engineering - Ford Plant
Norfolk, VA
Services
Painting Robot Installation (Plant Shutdown Work)
Value
$40,900
Scope
Fabricate and install
structural support stands to install four robots in paint booth at the
Ford Plant in Norfolk during Thanksgiving 1997 shutdown.
Install 4 robots in paint booth during Christmas 1997 shutdown, which consisted of equipment rigging, transporting equipment on multi-ton rollers to the new stands in paint booth. Optical setting and alignment of robots was required in order to complete the project. Two robots open the doors on each side of the truck body. The two other robots paint the door jambs.