Showcase Projects

Virginia Power


Chesterfield Power Station
Portsmouth (Chesapeake Energy Center)
Yorktown Power Station
Possum Point Power Station
Mt. Storm (West VA)
Bremo Bluff Power Station

Value
$52 million

Services
Installations completed/in progress at above facilities include: Coal yard lighting, station facilities lighting replacement and upgrade, sandblasting and painting of structural steel, painting of turbine building including ceiling overhead crane, and generating equipment, construction of concrete flood wall around station, I & C work, various HVAC projects including locker room, labs and control rooms, installation of monorails and rigging beams, multitude of piping systems (carbon steel, stainless steel and PVC) including condensate and steam, chlorine injection, feed water, ash piping system and piping and storage tanks for water treatment system, retube of boilers, repair of precipitators and economizers. Equipment installations include pumps, fans, coal conveyors and associated coal handling equipment.

Site
Chesterfield Power Station

Services
Unit No. 6, 10th Stage Extraction Line Replacement Steam Piping - Spring Outage 1995

Value
$171,300

Scope
Demo, existing 12" dia. Steam piping and replace with new 12" dia. Chrome/moly piping and supports - 100% preheat and stress relieving of welds - 100% weld x-rays - development of special welding procedure for this project. Testing of welders and quality control records.

Site
Fossil Fuel Hydro Plants (16 locations throughout VA, West VA and NC)

Services
Maintenance Support Craft Contract

Value
$500,000

Scope
At present, projects consist of supplying boilermakers, pipefitters, millwrights, etc. to assist in routine maintenance such as boiler tube repairs, cold bunker repairs, turbine generator lube system installation, conveyor belt rebuild and boiler buck stave repairs. In addition, general construction work such as rebuilding of existing fire water pump house and walled replacement in coal storage building maintenance shop.

Assisted in inspection of 275' diameter oil storage tank and weld repairs of same.

Removal and replacement of shaker weights in precipitator.